Project calendar
Updated
The project calendar shows a project's tasks laid out by their start and due dates. You'll find it on the project's Calendar tab. Use it to see when work is planned and how tasks are spread across the project.
When to use it
Use the Calendar tab to spot upcoming deadlines, see overdue work and find tasks that still need dates. The List tab is better for working through and completing tasks one by one.
How it works
To open the calendar, go to a project and select the Calendar tab at the top of the project.
How tasks appear
The calendar places each task by its start and due dates:
A task with both a start date and a due date spans the days between them.
A task with only one of those dates appears on a single day.
A task missing both dates doesn't appear on the calendar.
Each task is colored by its status:
Gray: not started
Yellow: in progress
Green: complete
Red: overdue
A blocked task that isn't complete doesn't get any of these colors.
Move around the calendar
The header at the top of the calendar has these controls:
Previous and next arrows to move backward or forward.
Today to jump to today's date.
A button on each side labeled with the project's start date and end date. Select one to jump to that date.
A view dropdown with Day, Week and Month. Month is the default.
A mini calendar at the top of the left panel also lets you pick a date to jump the main calendar to it.
The task list
The left panel is titled Project Tasks, with the number of tasks beside it. Use the Group by... dropdown to group the list by Status, Module, Assignee, Start Date, End Date, Org/Customer or Month Due. Status is the default.
Each task in the list shows a colored square for its status, plus its assignee and its due date. A task with no assignee shows Unassigned, and one with no due date shows no due date.
In the list, you can:
Select a group's title to hide that group's tasks from the calendar. The group dims. Select it again to show them.
Select the caret beside a group to collapse or expand it.
Select a task to move the calendar to that task's date and open the task details panel. You can update the task there without leaving the calendar.
Change task dates on the calendar
To change a task's dates, drag it to a new day, or stretch it to cover more or fewer days. This updates its start and due dates. Complete tasks can't be moved. If you can't update tasks on the project, the task snaps back to where it was.
Create a task from the calendar
To add a task on a date, select the date, then select it again. The Create Task dialog opens with that date filled in as the start and due date. Enter a Task Name and Module Name, which are both required. You can also change the Start date and Due Date and choose an Assignee. Only people who can create tasks on the project can open this dialog.
Review tasks missing dates
When some tasks are missing dates, a Review Tasks button appears at the top of the calendar, with the number of tasks beside it. Select it to open Tasks to Review, which lists:
Tasks missing both dates
Tasks missing a start date
Tasks missing a due date
Select a task's name to open it and add its dates.
Limits
Tasks missing both a start date and a due date never appear on the calendar. Give tasks dates so the calendar shows the full schedule.
You can't drag complete tasks to new dates.
The calendar doesn't show task dependencies. Use the Gantt chart for those.